Daniel Drive Reconstruction
Daniel Drive is a well-traveled neighborhood route, especially for families walking to the nearby elementary school. Years of wear created ponding, pavement failures, and accessibility issues. Westra reshaped the corridor to improve safety, mobility, and drainage, completing the work within the school’s limited summer construction window.
Envisioning a Safer Neighborhood Path
Client: City of Arlington
Location: Arlington, Texas
Services:
Engineering Response
Southern Segment: 1,830 feet, 38 – foot width, 7 – inch concrete pavement Northern Segment: 1,860 feet, 41 – foot width, 9 – inch pavement for school – area traffic
Concrete pavement and driveway reconstruction ADA – compliant sidewalks and ramps Reconstructed storm drain inlets LED street lighting upgrades Grade adj ustments to remove ponding and improve performance
Threading a 41-foot collector into a 60-foot ROW required precision. Through split-curb layouts and careful sidewalk grading, Westra delivered a design that maintained accessibility and blended seamlessly with nearby homes. The improved Daniel Drive now offers a smoother, safer, and more reliable path for families and daily school traffic.
Points of Project Interest